
Worthing, 1950s semi
Old tank out, space back
- Tank removal
- Pipe lagging
- Timber repair
- Boarding
- The problem
- A redundant cold water tank on a sagging platform, taking up the only flat area in the loft.
- What we did
- Drained and cut up the tank, capped the pipework, lagged every pipe above the insulation, sistered a notched joist and boarded the freed-up space.
- The result
- Six square metres of new storage where the tank used to be.
[Replace with a real job: before and after photos, approximate cost, customer quote if permitted.]
