Repairs and water
Tank Stillage & Timber Repairs
A full cold water tank weighs about 250kg. It sits on a timber frame that may be seventy years old. If the platform is sagging, the joists are cracked or a rafter has rotted under a leak, we rebuild or sister the timber so the structure is sound again.

- NICEIC registered
- £2m public liability insurance
- Level 2 NVQ Carpentry
- 20 years' experience
Sound familiar?
The problems we get called about.
If any of these sound like your loft, send a photo through the hatch and we will tell you what it needs.
- A tank platform that has bowed and sits at an angle.
- A joist split where a previous trade notched it for a pipe.
- Rafter feet softened by years of a dripping gutter.
- Purlins or struts removed by someone who wanted more space.
What is included
What we do, line by line.
- Structural check of the tank platform, joists and rafters.
- New stillage built from treated timber, spread over enough joists to carry the load.
- Cracked or notched joists sistered with new timber bolted alongside.
- Rotten rafter sections cut out and spliced.
- Timber treated against rot and insect attack.
- Photographs of the finished work in the areas you cannot reach.
How it works
Good loft space in four steps.
- 01
Call or send a message
Tell us what is happening above your ceiling. A photo through the hatch helps.
- 02
We survey the loft
We measure headroom, joists, insulation depth and wiring, then send an itemised quote within two working days.
- 03
One visit, whole job
Most lofts are finished in a day. Larger jobs take two. We tell you which before we start.
- 04
Walk-through and photographs
You see the finished work, and we leave photographs of the areas you cannot reach.
Questions
Things people ask about this job.
General questions
Things people ask before they call.
Related
Often done on the same visit.
Get in touch
So, tell us how you are ceiling.
Call, WhatsApp or send the form. We reply within one working day and survey homes across Brighton, Hove and Sussex.



